The Oshman Firm

$1,225,000 – Excavation Accident

$1,225,000 – Construction Accident. Plaintiff was performing excavation work in a trench when it was caused to collapse due to improper shoring and support of the trench walls. Plaintiff sustained a crush injury and fracture to a leg requiring surgical correction. Case settled in the middle of trial.

Exit mobile version